Cured-In-Place-Pipelining Demonstration Days July 18 – 19

Perma-Liner Industries, LLC. to Hold Live Cured-In-Place-Pipelining Demonstration Days and Educational Sessions Open House will be held in Anaheim, Cali. on July 18 – 19 ANAHEIM, Cali. – With state-of-the-art technology options, it is not necessary to dig up aging or failing pipes to repair them. There is an efficient and cost-effective way to repair these pipes called the Cured-In-Place-Pipe (CIPP) method. Perma-Liner™ Industries, LLC. (“Perma-Liner”), the leading manufacturer and supplier of trenchless pipeline rehabilitation equipment and materials in North

Continue reading

Epoxy vinyl ester resin brings many advantages to CIPP industry

Perma-Liner™ Industries, LLC. (“Perma-Liner”), the leading manufacturer and supplier of trenchless pipeline rehabilitation equipment and materials in North America, is introducing a new high-performance epoxy vinyl ester resin called Perma-Liner™ Vinyl Ester. The resin is Bisphenol-A Epoxy-based dissolved in styrene and is available now for purchase. “We are excited to introduce our newest resin into our already broad spectrum of products,” said Jerry D’Hulster, president of Perma-Liner Industries, LLC. “The high-performance epoxy vinyl ester resin offers an excellent balance of

Continue reading

America’s Failing Water Infrastructure: There are Ways We Can Begin to Fix It

There are many variables threatening America’s water from pollution issues and aging infrastructure to raising costs and droughts and rainfall patterns as the climate changes. The U.S. used to be a leader when it came to water infrastructure and management. Now, the U.S. is lagging behind receiving D ratings for dams, drinking water and wastewater. It’s time to start focuses on possible solutions to curb these issues – the U.S. can get A ratings and below are some of the

Continue reading

Miami is Pioneering Advancements in Sewage Containment

In an effort to adapt to a state law prohibiting Miami-Dade’s disposal of treated sewage through ocean outfall pipes, the county is building injection wells designed to pump treated waste into a cavern like space or ‘ boulder zone’.  Deep caverns have been documented in Florida’s geology. The county currently has 21 injection wells in north and south Dade. By 2025, it is projected to be double that amount at a cost summary of $635 million. This initiative is considered

Continue reading
Perma-Liner

Live Demonstrations Coming Soon!

LIVE DEMONSTRATIONS REGISTRATION JUNE 16TH – 18TH JAM PACKED WITH LIVE DEMOS & THE LATEST CIPP TECH. TUESDAY, JUNE 16TH THRU THURSDAY JUNE 18TH Don’t miss this three day event at our corporate facility in sunny Florida! This event will be jam packed with live demonstrations and the latest CIPP technology. Live Demonstrations: Perma-Main™ Continuous Lining Top Gun, Perma-Lateral™ Lining with Steam Cure, Sectional Point Repair, Pull In Place, Reinstatement Cutters and more! Show Specials: Specials will be announced during the event

Continue reading